News

  • AmCham
  • Cámara Argentino - China
  • Cámara Argentino - Holandesa
  • Cámara del Asia
  • Cámara Heleno - Argentina
  • Bimco
  • Itic
  • ISO certified CO
  • Centro de navegación
  • Fonasba

BAHIA BLANCA Port / Pier Nº 5 Puerto Galvan / NEW Loa restriction

Date: 08/01/2019

Please note the Bahia Blanca port administrator informed that due an undeclared collission occurred last Dec 25th with the mv TRUDY to Pier 5, the authorities determined a max LOA of 190 meters for all vessels calling Pier 5 Puerto Galvan. Usually this pier is used for fertilizer discharges and multipourpose vessels.  Any vessel to call Pier 5 with an LOA over 190 meters will have to be evaluated by the authorities if it can berth or not.
The damage occurred over the inner channell outlying dolphin. Port authorities are evaluating alternative options to repair mentioned dolphin.

We will keep you informed.

Port Status Since

Bahía BlancaOpen16/03/2019 - 0300 hs
NecocheaOpen03/12/2019 - 0920 hs
RamalloOpen12/10/2017 - 0730 hs
RosarioOpen19/03/2019 - 1710 hs
San LorenzoOpen16/09/2019 - 0820 hs
San NicolásOpen12/10/2017 - 0730 hs
V.ConstituciónOpen12/10/2017 - 0730 hs
CampanaOpen20/04/2017 - 0840 hs
ZárateOpen02/06/2017 - 1040 hs
Zona ComunOpen15/07/2019 - 1240 hs
Recalada P.S.Open19/06/2019 - 0830 hs