News

  • AmCham
  • Cámara Argentino - China
  • Cámara Argentino - Holandesa
  • Cámara del Asia
  • Cámara Heleno - Argentina
  • Bimco
  • Itic
  • ISO certified CO
  • Centro de navegación
  • Fonasba

Vessel's main engine out of service and obstructing navigation

Date: 24/12/2018

Please kindly note that, on December 23rd at 1415 hrs LT, the m.v. INTERLINK FORTUITY, loaded with abt 33.000 - Maize, suffered a damage in her main engine (apparently, one piston broke down).
She is obstructing the navigation as she's stopped at the center of the navigation channel at Km 139 of Parana de las Palmas river.
 

The vessel continues obstructing the main channel navigation and despite the efforts of two tug boats (Tugboat PAMPERO & Tugboat CANDELA S) which are assisting her, she is still ran aground at Km 139 of Parana de las Palmas river.


Name: m.v. INTERLINK FORTUITY
Cargo: abt 30.000 Mt - Maize
Destination: San Antonio (Chile)
Agents: Nabsa.

Port Status Since

Bahía BlancaOpen16/03/2019 - 0300 hs
NecocheaOpen03/12/2019 - 0920 hs
RamalloOpen12/10/2017 - 0730 hs
RosarioOpen19/03/2019 - 1710 hs
San LorenzoOpen16/09/2019 - 0820 hs
San NicolásOpen12/10/2017 - 0730 hs
V.ConstituciónOpen12/10/2017 - 0730 hs
CampanaOpen20/04/2017 - 0840 hs
ZárateOpen02/06/2017 - 1040 hs
Zona ComunOpen15/07/2019 - 1240 hs
Recalada P.S.Open19/06/2019 - 0830 hs