News

  • AmCham
  • Cámara Argentino - China
  • Cámara Argentino - Holandesa
  • Cámara del Asia
  • Cámara Heleno - Argentina
  • Bimco
  • Itic
  • ISO certified CO
  • Centro de navegación
  • Fonasba

Marti­n Garci­a Channel navigation - Dredging Works (August Update)

Date: 30/08/2018

Pls find attached herebelow, the last official depths of Marti­n Garcia channel (Uruguay river) based on the dredging works that are being carried out. 
So far the draft limitation remains without changes as the depth of the lowest point is still 9,75 meters to 0 level (Km 63,8 of the Farallon pass). 
Once finalized the dredging works the draft limitation would be as reference 10,36 meters to 0 level using the river water level to comply with the compulsory 2 feet of UKC. 
This expected change in the draft limitation of Martin Garci­a channel will have a big impact in the vessels calling Nueva Palmira port. 

Port Status Since

Bahía BlancaOpen16/03/2019 - 0300 hs
NecocheaOpen03/12/2019 - 0920 hs
RamalloOpen12/10/2017 - 0730 hs
RosarioOpen19/03/2019 - 1710 hs
San LorenzoOpen16/09/2019 - 0820 hs
San NicolásOpen12/10/2017 - 0730 hs
V.ConstituciónOpen12/10/2017 - 0730 hs
CampanaOpen20/04/2017 - 0840 hs
ZárateOpen02/06/2017 - 1040 hs
Zona ComunOpen15/07/2019 - 1240 hs
Recalada P.S.Open19/06/2019 - 0830 hs