News

  • AmCham
  • Cámara Argentino - China
  • Cámara Argentino - Holandesa
  • Cámara del Asia
  • Cámara Heleno - Argentina
  • Bimco
  • Itic
  • ISO certified CO
  • Centro de navegación
  • Fonasba

Draft drastically dropped at San Nicolas port / New Port berth

Date: 10/07/2018

Please kindly note that we've just informed by San Nicolas port / New Port berth authorities, as well as by Coast Guard, that last Friday (July 07th), the New Port administration performed a bathimetry in the New Port access channel and found out that the entering draft to New Port is 6,90 mts + River height - 0,60 cm (Security margin UTK).


I.E., considering Parana river dropping level, the maximum draft for today is only 8,30 mts (and subject to Parana River water level variations)

Presently, there are 2 vessels at roads which are not able to enter: m.v. BEN NEVIS (Draft 10,30 mts) and m.v. BUNUN CHAMPION (Draft 9,50 mts)

It is remarcable that this measurement is NOT OFFICIAL but the Port Pilots already take it as valid.

We'll follow and monitor the situation and keep you closely posted.

Port Status Since

Bahía BlancaOpen16/03/2019 - 0300 hs
NecocheaOpen03/12/2019 - 0920 hs
RamalloOpen12/10/2017 - 0730 hs
RosarioOpen19/03/2019 - 1710 hs
San LorenzoOpen16/09/2019 - 0820 hs
San NicolásOpen12/10/2017 - 0730 hs
V.ConstituciónOpen12/10/2017 - 0730 hs
CampanaOpen20/04/2017 - 0840 hs
ZárateOpen02/06/2017 - 1040 hs
Zona ComunOpen15/07/2019 - 1240 hs
Recalada P.S.Open19/06/2019 - 0830 hs