News

  • AmCham
  • Cámara Argentino - China
  • Cámara Argentino - Holandesa
  • Cámara del Asia
  • Cámara Heleno - Argentina
  • Bimco
  • Itic
  • ISO certified CO
  • Centro de navegación
  • Fonasba

Maximum sailing draft from Nueva Palmira port back to REMAGA standards

Date: 21/09/2017

As you may recall, due to the narrowing of Martín García channel at some critical points, maximum sailing draft from Nueva Palmira port was reduced on June 26th to 9.45 mts (31 ft.). 
On July 24th recommended sailing draft by Uruguayan pilots was further restricted to 9.15 mts (31 ft.) to avoid bigger delays. 
Yesterday September 20th Uruguayan authorities (Pilotage section of Uruguayan Coast Guard) announced that said restriction is now lifted after dredging works, being REMAGA standards valid again. 
The same is 9.75 meters (for the ships of design) considering an average river water level of abt 60 cms to comply with the compulsory 2 feet of UKC. 

Port Status Since

Bahía BlancaOpen16/03/2019 - 0300 hs
NecocheaOpen03/12/2019 - 0920 hs
RamalloOpen12/10/2017 - 0730 hs
RosarioOpen19/03/2019 - 1710 hs
San LorenzoOpen16/09/2019 - 0820 hs
San NicolásOpen12/10/2017 - 0730 hs
V.ConstituciónOpen12/10/2017 - 0730 hs
CampanaOpen20/04/2017 - 0840 hs
ZárateOpen02/06/2017 - 1040 hs
Zona ComunOpen15/07/2019 - 1240 hs
Recalada P.S.Open19/06/2019 - 0830 hs