We're pleased to inform you that Ibicuy Continental berth's rebuilding is almost completed. Authorities estimate that it will be ready for operations and enabled on June 2016. We remember you that berth is located at Km 218 of Ibicuy River, situated on the left bank and abt 7 Km above the point where it joins with Parana Guazu (Km 211). Continental berth is of reinforced concrete and steel construction, 160 mts long, 14 mts wide, with outlying mooring points for head/stern lines. Maximum LOA 220 mts. Keep you posted.