Following the grounding episode of m.v. PILATUS VENTURE at km 325 Parana River and her later refloating, Ramallo Coastguard carried out a bathymetry on the area, and its results show there has been no change in the draft informed this morning. Therefore, navigation is allowed with no restictions.