Pls note that, as advised before, dredging operations will commence on early Oct at Martin Garcia channel. The aim is to recover channel's depth to 32' 00" and design width to former values in a 9 months time period. After that, and on a second stage, there will be a RFO in order to dredge the channel to 34' 00". We will keep you posted with progress and any changes to the sailing draft.