News

  • Cámara Heleno - Argentina
  • Bimco
  • Itic
  • ISO certified CO
  • Centro de navegación
  • Fonasba

m.v. RT TANNAT - Aground at KM 191 Punta Indio Channel (River Plate).

Date: 20/10/2025

Please note today Oct 20th 0750hs, mv RT TANNAT run aground at Km 191 of Punta Indio Channel (River Plate) 

As per pilots information, the vessel suffered a reduction on its speed and subsequent grounding. 

Vessel partially obstructs the navigation channel (max width in the area 160 meters for crossing).  

0820hs mv ELM ARROW (ballast condition) crosses the grounding area without inconveniences.

Next high tide 1330hs. Pilot will try to free from the grouding area.

m.v. RT TANNAT:  Panamax (229/32,26/20,5). Sailing draft 10,36 meters (loaded with 45.790 mt of iron ore ex Nueva Palmira bound to Recalada).

We´ll keep you posted. 

Port Status Since

Bahía BlancaOpen16/03/2019 - 0300 hs
NecocheaOpen03/12/2019 - 0920 hs
RamalloOpen12/10/2017 - 0730 hs
RosarioOpen19/03/2019 - 1710 hs
San LorenzoOpen16/09/2019 - 0820 hs
San NicolásOpen12/10/2017 - 0730 hs
V.ConstituciónOpen12/10/2017 - 0730 hs
CampanaOpen20/04/2017 - 0840 hs
ZárateOpen02/06/2017 - 1040 hs
Zona ComunOpen15/07/2019 - 1240 hs
Recalada P.S.Open19/06/2019 - 0830 hs