News

  • Cámara Heleno - Argentina
  • Bimco
  • Itic
  • ISO certified CO
  • Centro de navegación
  • Fonasba

Draft Limitations Expected Until Next Week at San Lorenzo Port

Date: 09/10/2025

The dredger “La Pinta” is presently working across different river sections. However, dredging remains limited due to low water levels, which prevent access to sediment disposal areas. This restriction is directly affecting the available drafts in the area, particularly at Paso Bella Vista / Copelo (Km 456,8).

 

Draft Situation – San Lorenzo / Timbues

 

At present, the maximum authorised draft for the following terminals is:

Renova, LDC Timbúes, Cofco Int. Timbúes, ACA Timbúes, AGD Timbúes, Profertil, Min. Alumbrera, T6, Arauco, Quebracho, Cofco PGSM (North & South), 

ADM Agro, Pampa, Dempa ➡️ 10,13 mts = 33’03” (restricted by Paso Bella Vista / Copelo)

Other terminals are affected instead by the Fighiera passage or access channels:

  • ACA / Nouryon Chemicals / Vicentin / San Benito → 10,38 mts = 34’01” (Passage Fighiera, Km 379,4)
  • TFA Fertilizers → 9,71 mts = 31’10” (Access Channel)
  • Pampa Energía → 9,41 mts = 30’10” (Access Channel)

Draft Situation – Rosario Port

 

Open Berths, Unit 6 & 7, VGG, Pta. Alvear, Gral. Lagos, Dreyfus Liquids, ADM Agro Arroyo Seco ➡️ 10,38 mts = 34’01” (restricted by Passage Fighiera, Km 379,4)

Expected Impact

 

Draft restrictions at San Lorenzo North and Timbues terminals are expected to continue at least until next week, depending on dredging progress and water level conditions.

We will continue to monitor the situation closely and revert with further updates.

Best regards,

Port Status Since

Bahía BlancaOpen16/03/2019 - 0300 hs
NecocheaOpen03/12/2019 - 0920 hs
RamalloOpen12/10/2017 - 0730 hs
RosarioOpen19/03/2019 - 1710 hs
San LorenzoOpen16/09/2019 - 0820 hs
San NicolásOpen12/10/2017 - 0730 hs
V.ConstituciónOpen12/10/2017 - 0730 hs
CampanaOpen20/04/2017 - 0840 hs
ZárateOpen02/06/2017 - 1040 hs
Zona ComunOpen15/07/2019 - 1240 hs
Recalada P.S.Open19/06/2019 - 0830 hs