MV THOMAS C: Refloated on Nov 18th, 2125 hrs, assisted by tugboats "Querandi" & "Ranquel". She's now at km 208, Parana Guazu performing routine inspections.
Deepening at Quequen port / Dredging works completed Please note that, with the departure of IBN BATTUTA (November 29th at 0915 hrs LT), the last dred
MV THOMAS C: Refloated
m.v. CL RIZHAO refloated by assistance of Tugboat COOPOR ESTIBADOR II Pls note: